Effective date: September 9, 2026
(tenth revision)
This directive describes the Canadian program established to meet the phytosanitary import requirements for some host species of Agrilus spp. as prescribed in the Commission Implementing Decision of the European Union 2019/2072 of 28 November 2019. It also applies to countries that have adopted similar import requirements such as:
- the United Kingdom (UK)
- Türkiye
- Norway
This directive lays down all the necessary requirements based on a systems approach that exporters need to meet for the export of lumber of the following genera:
- ash
- birch
- chestnut
- oak
Latest revisions
This directive has recently been renamed and revised to reflect changes in terminology to support the integration of the Hardwood Export Program into our digital platform (6th revision), The 7th revision was to add Norway to the countries to which this directive applies. The 8th revision was to add chestnut and oak to the wood species that must meet the requirement of this directive for exports to the European Union (EU). This 9th version removed the heat treatment option for ash lumber to Türkiye. However, the option was readded in the 10th version due to a change in Türkiye's legislation.
On this page
- 1. Introduction
- 2. Legislative authority
- 3. Definitions
- 4. Scope
- 5. Program requirements
- 6. Phytosanitary requirements
- 7. Program oversight
- 8. References
- Appendix 1: Elements that must be identified in the facility preventive control plan
- Appendix 2: Facilities approved under Hardwood Export Program (D-14-02)
1. Introduction
On June 17, 2014, the EU revised its phytosanitary import requirements for ash (Fraxinus spp.) and birch (Betula spp.) wood. The changes were introduced to prevent the entry and spread of emerald ash borer (Agrilus planipennis) and bronze birch borer (Agrilus anxius).
To facilitate the export of sawn wood from host species regulated by the EU, we established this program. It is based on an existing audit-based systems approach used for the import and domestic movement of sawn wood from host species of Agrilus planipennis (D-03-08).
On March 17, 2016, after bilateral discussions with the EU, Canada was granted a derogation for the export of ash wood originating or processed in Canada (Commission Implementing Directive 2016/412 (EU)). The export option under the EU derogation includes heat treatment/kiln drying (HT/KD) for the production of a compliant article under a systems approach.
On February 3, 2017, the EU granted a similar derogation to the U.S. for the export of ash wood: Commission Implementing Decision (UE) 2017/204.
The derogation has been renewed for Canada and the U.S. in 2018 and 2020 and has now been made permanent under the main EU plant health regulation: Commission Implementing Regulation (EU) 2019/2072.
Commission Implementing Regulation (EU) 2019/2072 will be revised in 2026. The revision will introduce import requirements for chestnut (Castanea spp.) and oak (Quercus spp.) wood to prevent the entry and spread of the two-lined chestnut borer (Agrilus bilineatus).
- the UK
- Türkiye
- Norway
2. Legislative authority
- Plant Protection Act (S.C. 1990, c.22)
- Plant Protection Regulations (SOR/95-212)
- Canadian Food Inspection Agency Fees Notice, Canada Gazette, Part 1 (as amended from time to time)
- Canadian Food Inspection Agency Act, S.C. 1997, c.6
3. Definitions
Definitions of terms used in the present document can be found in the Plant health glossary of terms.
4. Scope
This directive is intended for use by the CFIA inspectorate and under the program registered Canadian exporters intending to export regulated wood articles to:
- the EU
- the UK
- Türkiye
- Norway
4.1 Regulated pests
- emerald ash borer (Agrilus plannipenis)
- bronze birch borer (Agrilus anxius)
- two-lined chestnut borer (Agrilus bilineatus)
4.2 Regulated articles
Regulated articles include:
- round wood
- sawn wood
- poles
- cants
These articles of the following species are regulated to prevent the entry and spread of:
- emerald ash borer:
- Fraxinus spp.
- Juglans ailantifoliaFootnote 1
- Juglans mandshuricaFootnote 1
- Ulmus davidianaFootnote 1
- Pterocarya rhoifoliaFootnote 1
- Chionanthus virginicusFootnote 1
- bronze birch borer:
- Betula spp.
- two-lined chestnut borer:
- Castanea spp.Footnote 1
- Quercus spp.
4.3 Regulated areas
All areas of Canada are regulated. The EU does not recognize Pest Free Areas for the emerald ash borer, the bronze birch borer or the two lined chestnut borer in Canada and the U.S.. Therefore, Pest Free Areas cannot be used as a basis for phytosanitary certification in Canada or the U.S. for wood of:
- ash
- birch
- chestnut
- oak
Exporters intending to export regulated articles from all areas of Canada or the U.S. must comply with the requirements specified in section 5 of this policy directive.
5. Program requirements
Facilities intending to export regulated articles originating or processed in Canada, to the following destinations must register with us on the Hardwood Export Program by submitting a service request through their My CFIA account:
- the EU
- the UK
- Türkiye
- Norway
Facilities are required to develop a preventive control plan (previously known as quality manual). Guidelines for development of a preventive control plan can be found in appendix 1. Before registration is approved, we will verify if the facility meets the requirements of the program (see section 6 for further information).
My CFIA uses the term "preventive control inspection" in place of "audit" and "terms and conditions" in place of "requirements".
Under the program, facilities must describe their operating procedures in detail in their preventive control plan, indicating how they will meet the phytosanitary requirements. This includes all of the treatments, as well as other elements to produce compliant sawn wood such as procedures related to:
- labelling
- traceability
- segregation
Facilities currently registered in 1 of our forestry programs may amend their plan to add a module describing the specific procedures used to address the export requirements specified in this Hardwood Export Program (directive D-14-02). This includes facilities registered under the emerald ash borer program (directive D-03-08) or the heat treatment program (directive D-13-01).
6. Phytosanitary requirements
6.1 Debarking, heat treatment and moisture reduction
The following requirements apply to ash wood exported to all countries covered by this directive:
Export shipments must be accompanied by a CFIA-issued phytosanitary certificate. Shipments of ash wood must meet all of the following elements and processing requirements:
- ash wood is produced from debarked round wood
- ash wood has been debarked to International Standard for Phytosanitary Measures (ISPM) 15 tolerance (pieces of bark are less than 3 cm in width (regardless of length) or if they are greater than 3 cm in width, the total surface area of each individual piece of bark is less than 50 cm2)
- ash wood is heated through its profile to at least 71°C for 1200 minutes (20 hours) in a heat chamber approved by us or by an agency approved by us
- ash wood has a final moisture content of 10% or less; and has been in a kiln for at least a 2-week period
- each bundle of wood must visibly display both a bundle number and a label with the words 'HT-KD' or 'Heat Treated-Kiln Dried'
That label must be issued by or under the supervision of, a designated officer of the registered facility after verifying that the processing requirements set out previously have been complied with - the bundle number(s) and the registered facility name must also be on the phytosanitary certificate
- facilities must undergo an audit by us or an agency approved by us, once a month
- facilities must agree to have their information posted on our website as per the importing country's requirements
- facilities must perform and record pre-audit of shipments to confirm all the requirements have been met
We may also conduct pre-inspection or verify the facilities' reports during an audit.
For the re-export of ash wood originating in the U.S., the wood must be processed in a registered facility in Canada or the U.S. and meet all the previous conditions. Ash wood imported from the U.S. must meet the import requirements under directive D-03-08.
For the re-export of ash wood processed in a registered facility in the U.S., re-export certification may be based on:
-
a United States Department of Agriculture Animal and Plant Health Inspection Service (USDA-APHIS) issued phytosanitary certificate with an Additional Declaration as specified in the importing country's regulation
or
-
a National Hardwood Lumber Association (NHLA) certificate certifying that the wood meets all the importing country's requirements
The inspector must verify the list of registered facilities on the USDA-APHIS website
To understand how to receive a phytosanitary certificate or a phytosanitary certificate for re-export:
-
or
- contact your local CFIA office
6.2 Debarking and cambium/sapwood removal
The following requirements apply to:
- ash lumber to Türkiye
- birch lumber to Türkiye, the EU, the UK and Norway
- oak and chestnut lumber to the EU
Export shipments must be accompanied by a CFIA-issued phytosanitary certificate.
Shipments must meet the following requirements:
- bark and at least 2.5 cm of outer sapwood has been removed in a facility registered by us
For us to certify shipments of ash, birch, chestnut and oak wood originating in the U.S. and issue a phytosanitary certificate for re-export, the wood must be:
-
processed in a registered facility under this program in Canada
or
-
accompanied by a USDA-APHIS-issued phytosanitary certificate certifying the removal of bark and at least 2.5 cm of outer sapwood and with the appropriate additional declaration under the importing country's regulation
To understand how to receive a phytosanitary certificate or a phytosanitary certificate for re-export:
-
or
-
contact your local CFIA office.
7. Program oversight
7.1 Audit
We or an agency approved by us will conduct audits of facilities participating in the program to determine compliance with the facility's preventive control plan and section 5 of this directive.
Our audit will be on a quarterly basis for facilities exporting birch, chestnut and oak lumber and once a month for those exporting ash lumber under the program.
7.2 Preventive control plan review
Prior to the approval of a facility's registration, we will review the preventive control plan to verify that all prescribed elements of appendix 1 are addressed. If the registered facility changes any of its practices, the preventive control plan must be amended and submitted to us for review and re-approval.
7.3 Evaluation edits
Once we approve the preventive control plan and a facility receives good standing in the evaluation audit, the facility's registration will be approved under the program.
7.4 System audits
Once registration is approved, a facility will be audited by us or by an agency approved by us, to verify continued compliance with the facility's preventive control plan and section 5 of this directive.
7.5 Non-compliances
We will not certify non-compliant articles. The exporter may choose to ship the commodity to another destination if it complies with the phytosanitary requirements of the receiving country.
7.5.1 Suspension, reinstatement, cancellation and voluntary withdrawal
If a facility audit has determined that the registered facility no longer meets the requirements of the program, their registration status will be suspended. We shall notify the registered facility of the action to be taken and identify the deficiencies that require correction action(s) to be taken.
Once all necessary corrective actions developed by the facility have been implemented and approved by us, a facility may be reinstated on the program. The facility must re-submit a revised preventive control plan identifying the corrective actions they have taken. We will conduct a follow up audit at the facility to determine if the corrective actions address the non-conformances.
Facilities that are unable to address the necessary corrective actions or have a total failure of their preventive control plan management system will immediately have their registration on the program cancelled (revoked).
Facilities that voluntarily withdraw from the program or whose registration is cancelled by us, will be removed from our list of registered facilities.
Individuals or companies that do not comply with the Plant Protection Act and Plant Protection Regulations may be subject to additional actions, including enforcement actions.
8. References
8.1 Fees
We charge fees in accordance with our Fees Notice. Anyone requiring further information regarding fees may contact their local CFIA office or visit the CFIA's Fees Notice page.
8.2 Supporting documents
- D-03-08: Phytosanitary Requirements to prevent the introduction into and spread within Canada of the Emerald Ash Borer, Agrilus planipennis (Fairmaire)
- QSM-07: Quality Management System Manual for Facilities Registered in the Emerald Ash Borer Approved Facility Compliance Program (EABAFCP)
- European Commission, Official Journal of the European Union, Commission Implementing Directive 2014/78/EU, 2014, Brussels, Belgium
- European Commission, Official Journal of the European Union, Council Directive 2000/29/EC, 2000, Brussels Belgium
- D-99-06: Policy on the issuance of phytosanitary certificates and phytosanitary certificates for re-export
- European Commission, Official Journal of the European Union, Commission Implementing Decision (EU) 2016/412 of 17 March 2016
- D-13-01: Canadian Heat Treated Wood Products Certification Program (HT Program)
- Technical Heat Treatment Guidelines and Operating Conditions Manual (PI-07)
- ISPM 15 (as revised by CPM-8, 2013). Guidelines for regulating wood packaging material in international trade. Rome, IPPC, FAO
- Commission Implementing Regulation (EU) 2019/2072 of 28 November 2019 Plant Health Legislation – UK Plant Health Information Portal
- The plant quarantine regulations of Türkiye
- Norway Regulations of 1 December 2000 no. 1333 relating to plants and measures against pests, amendment no 1882 of 10 December 2018
Appendix 1: Elements that must be identified in the facility preventive control plan
Facilities must register under this program if they intend to ship hardwood lumber of genera regulated under directive D-14-02 which includes:
- ash
- birch
- chestnut
- oak
All elements relevant to meeting the importing country's requirements must be identified and described in the facility's preventive control plan (previously known as quality manual). This is to provide us assurances that lumber produced under this program meets importing country's import requirements.
The preventive control plan must outline the procedures and processes implemented by a facility to control the phytosanitary risk of pest spread associated with the movement of regulated articles.
It must include all the elements of a facility's operations that relate to pest risk mitigation. Details of these requirements are described in the following sections.
A phytosanitary management system that follows International Organization for Standardization guidelines or a similar management system may also be approved as a preventive control plan.
1. General requirements
1.1 Facility identification
The preventive control plan must provide the following information for each facility location where regulated articles are received and processed:
- name
- address
- a contact name
1.2 Organizing the plan
A table of contents page is required to improve the organization of the preventive control plan.
1.3 Modifying the plan
The facility must have a CFIA-approved and up-to-date copy of the preventive control plan with an assigned version number and date of revision. Subsequent changes must have a new version number and replace previous versions. When the preventive control plan is altered, the updated version must be sent to us for approval prior to implementation. Where repeated updates are required, an amendment log must be kept to document changes. A copy of the amendment log must be attached to the preventive control plan. Facility employees must be trained and informed of the procedure changes and the changes made to the preventive control plan once they have been approved by us.
2.0 Administration
2.1 Program manager
The preventive control plan must identify a program manager (previously named as certification manager) and an alternate to the program manager. The manager is the official contact with us and is responsible for:
- developing the preventive control plan
- enacting changes and updates
- providing training to employees with roles and responsibilities under the program and conducting optional internal audits
They will also be responsible for meeting with us and assigning employees to accompany and assist during audits. The program manager and the alternate must have expertise in identification of tree genera (logs and lumber). This expertise could be obtained from experience or education and must be described in the preventive control plan (for example, number of years of experience, courses taken, etc.).
2.2 Employee responsibilities
The preventive control plan must identify the employee members responsible for ensuring that the facility meets the export requirements. Position titles and a description of responsibilities in relation to this program must be documented.
3.0 Employee training
The preventive control plan must describe the training procedures of the employees responsible for procedures to meet the export requirements. This includes the specific training elements and the intervals between training sessions. The training records must include the names of the employees trained and the training topics covered. An example of a training record must be appended to the preventive control plan.
The following must be accessible to all facility employees that contribute to meeting export requirements:
- information on the signs and symptoms of Agrilus spp.
- a copy of the facility's preventive control plan
- this directive (D-14-02)
4.0 Phytosanitary elements (phytosanitary critical control points)
Phytosanitary elements are mandatory steps where regulated articles must be processed in accordance with the program. Phytosanitary elements were known before as the phytosanitary critical control points. These may include stages where regulated articles are:
- received
- segregated
- processed
- shipped
Facilities are encouraged to conduct internal audits following critical processing elements (for example, inspection of lumber to ensure bark and wane are removed or review of charge reports). If the facility does internal audits, the preventive control plan must identify all phytosanitary elements. It must also outline how the facility will conduct the internal audits of the elements to verify that regulated articles are processed in accordance with the program. The facility could develop a flow diagram to identify elements. Inspection and audit records of these elements must be current and complete.
Employees must fully understand their roles and responsibilities regarding phytosanitary elements.
4.1 Receiving regulated articles
The preventive control plan must document how incoming regulated articles are identified upon receipt. Procedures may include signing off on incoming shipping documents and applying unique markings for loads of regulated articles. The facility must keep a record/inventory of incoming regulated articles.
Import of regulated articles and their domestic movement must be in accordance with directive D-03-08. Facilities must indicate in the preventive control plan how they will meet the import and domestic requirements.
4.2 Segregation
Facilities must have procedures in place to ensure treated lumber destined for export under the program is segregated. It must be clearly marked with a unique identifier from lumber destined for domestic movement or export to other countries. Segregation methods may include physical barriers such as fencing designating areas identified with specific signage or other identification as described by the facility.
Logs from a Canadian regulated area for emerald ash borer coming in for processing must also be segregated where a facility is in a Canadian area that is not regulated area for the pest.
A site plan may be included with the preventive control plan to identify the location of these specific areas.
4.3 Processing/treatment procedures
Treatment/processing measures to generate compliant articles are outlined in section 5 of this directive.
The preventive control plan must indicate the processing procedures used to generate compliant regulated articles and the procedures used to confirm that the processing conditions are met.
Facilities in Canadian areas that are not regulated for emerald ash borer must process all ash material before the end of the low-risk season (before March 31) as per directive D-03-08 to prevent pest spread.
4.4 Traceability of regulated articles
Facilities may be required to show the origin of lumber to meet the certification requirements to export to some countries. For these specific situations, it is mandatory that procedures be instituted to allow the confirmation of origin. We may refuse to issue a phytosanitary certificate if the origin cannot be confirmed.
Facilities must be able to trace back the bundles of lumber being exported throughout the complete chain of processes to make the lumber compliant with the respective option chosen. This includes the traceability of movement of article (within and between facilities/mills) as well as the processing steps between the following as applicable:
- the raw wood
- the debarking
- the heat treatment
- the kiln drying
- the labelling of the final product
4.5 Debarking
The facility must adjust the debarking equipment to remove the required amount of bark whether for meeting the ISPM 15 tolerance or the removal of bark and an additional 2.5 cm of the cambium/sapwood, depending on the option chosen for the export of regulated article. The preventive control plan must describe the audit procedures throughout the process to guarantee debarking meets phytosanitary requirements for debarking.
If the registered facility is receiving sawn wood from another facility/mill, they must provide proof that lumber was produced from debarked logs as per the ISPM 15 tolerance for bark.
4.6 Heat treatment and kiln drying
Facilities must meet the treatment requirements of at least 71°C for 1200 minutes (20 hours) through the profile of the wood and a final moisture content of 10% or less.
The preventive control plan must describe the kiln layout, including:
- dimensions
- direction of air flow
- location of all sensors as described in PI-07
- an example of the charge report, showing the calculations used to confirm that heat treatment requirements are met
Heat treated lumber under the systems approach must be segregated from heat treated lumber meeting 56°C /30 minutes destined to other markets. Bundles must be marked and given a unique identifier which can be traced back to original material and the associated treatment process (kiln charge report).
The moisture readings as well as the drying period of at least two weeks must be recorded in a way that can be traced back to the bundles destined for export under the program.
If the facility receives heat treated lumber from another heat treatment facility, both must be registered under directive D-14-02. Also, all copies of the kiln charge reports and the information of the heat treatment facility must be kept for traceability and audit purposes.
4.7 Labelling
Each bundle of treated wood must visibly display both a bundle number and a label with the words 'HT-KD' or 'Heat Treated-Kiln Dried' and given a unique identifier for eligibility. The label must be issued by or under the supervision of a designated officer of the registered facility after verifying that the processing requirements have been complied with.
5.0 Other control activities
Other control activities implemented by the facility that may impact the integrity of the program must be included in the preventive control plan.
6.0 Records and documentation
Facilities are required to maintain records that track all activities related to this program for a minimum of 3 years. Examples of these records include:
- incoming shipping documents (requirement for sources of incoming wood destined for export)
- movement certificates
- log journals
- audit records for incoming regulated articles in non-regulated areas
- training records
- sales records for regulated articles sold
- audit reports
- corrective actions
For the purposes of this program, facilities must keep records of their procedures for our verification or the verification of an approved agency. These records must include:
- the duration of treatment
- treatment temperatures, when the parameters of schedule H in PI-07 were achieved
- the final moisture content of each bundle exported
6.1 Supplier list
Facilities must maintain a list of all suppliers, including U.S. suppliers from where regulated articles will be sourced. Changes made to the suppliers list must be documented. Contact your local CFIA office for more information.
6.2 Transportation of non-compliant regulated articles
Regulated articles must be transported under the conditions outlined in directive D-03-08, section 2 for domestic movement and section 3 for imports. The preventive control plan must outline how the facility will meet the requirements for transport of regulated articles. If facilities registered in the program are issued a movement certificate to allow the domestic movement of regulated articles, the preventive control plan must indicate the specific procedures and employees responsible for the care and control of these certificates. The following specific information must be maintained for each shipment transported under the authority of the movement certificate including:
- the movement certificate number
- product and quantity
- date of shipment
- origin/destination of shipment
Facilities using their own vehicles to transport non-compliant regulated articles outside of a Canadian regulated area must outline the procedures (for example, cleaning of trailer after unloading regulated articles) used to control the risk of pest spread.
6.3 Non-compliance
The facility must specify an internal process for addressing and recording non-compliances.
A non-compliance record must include the following information:
- description of the non-compliance (identification of cause)
- date of occurrence
- employees involved
- corrective actions taken to control and mitigates risks and prevent recurrence
- deadline for when the corrective action must be completed
- signature of approval by the program manager
An example of the facility's non-compliance record must be included in the preventive control plan.
6.4 Clean-up and disposal of by-products
Facilities in Canadian areas not regulated for emerald ash borer that are handling articles from Canadian regulated areas for the pest must specify that the following will be completed for the regulated articles by March 31, which is the end of the low-risk period:
- processing
- treatment
- clean-up
- disposal
Procedures to contact us once the final clean-up is completed must be outlined in the preventive control plan. We will verify the completion of clean-up and disposal activities.
6.5 Pest notification
Live emerald ash borer or signs of pest damage may be encountered by facility employees during the processing of regulated articles. All facilities must clearly state in their preventive control plan that they will notify us immediately if emerald ash borer is detected. This requirement applies to any life stage of the pest or any signs of the pest found on regulated articles sourced from Canadian areas not regulated for emerald ash borer.
6.6 Internal audits
Facilities are encouraged to conduct internal audits on a routine basis. Audits are internal checks that verify all procedures are carried out as outlined in the facilities' preventive control plan. The audits should include an audit of all the phytosanitary elements and should be recorded. If audits are conducted, a copy of the audit log must be included in the preventive control plan.
Audit reports must be made available to us during audits.